Buildings 8 & 9
Batch 1A Development
Completion By 2024 - 2025
Buildings 8 & 9
Download Here
Buildings 8+9

General Specifications

Property 1=Building Function
Building Function

Wet laboratory enabled building

Property 1=Typical Floor Area
Total Gross Floor Area (combined)

Approx. 32,000 m2

Property 1=Lab Provisions
Lab Provisions

Biosafety Level 3 / PRC P3 Lab provisions enabled

Property 1=Green Building Award And Accreditation
Green Building Award And Accreditation

BEAM Plus New Buildings V2.0 Provisional Platinum

BEAM Plus Neighbourhood V1.0 Platinum 

LEED Building Design + Construction Pre-Certification Gold 

Green Building Award 2023 - Merit Award 
(Project Under Construction and/or Design - Commericial )

Property 1=Typical Floor Area
Typical Floor Area

Building 8

G/F  Approx. 590 m2
1-8/F (4/F omitted) Approx. 1,900 m2

 

Building 9

G/F  Approx. 790 m2
1-8/F (4/F omitted)  Approx. 2,000 m2

Property 1=Typical Structural Clearance
Typical Structural Clearance

G/F  Approx. 5.75 m
1-8/F (4/F omitted) Approx. 4.62 m

Property 1=Floor Loading
Floor Loading

7.5kPa

Property 1=Air Conditioning & Mechanical Ventilation
Air-conditioning & Mechanical Ventilation

Approx. 9.3 m2 / TR for tenant area

General exhaust shaft to roof level at each unit

Property 1=Normal Electricity Supply
Normal Electricity Supply

365 VA/sq m for G/F

294 VA/sq m for 1/F - 8/F (4/F omitted)

Property 1=Lab Provisions
Provisions

Various gas and purified water (Type II) supply

Centralized neutralization system for chemical disposal

Emergency exhaust, emergency shower and eye-washer provided at corridors

Typical Floor Plan

Building 8
HSIPT Floorplan LB03 8HSIPT Floorplan LB03 8

The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.

 

In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.