General Specifications
Wet laboratory enabled building
Approx. 32,000 m2
Biosafety Level 3 / PRC P3 Lab provisions enabled
BEAM Plus New Buildings V2.0 Provisional Platinum
BEAM Plus Neighbourhood V1.0 Platinum
LEED Building Design + Construction Pre-Certification Gold
Green Building Award 2023 - Merit Award
(Project Under Construction and/or Design - Commericial )
Building 8
G/F Approx. 590 m2
1-8/F (4/F omitted) Approx. 1,900 m2
Building 9
G/F Approx. 790 m2
1-8/F (4/F omitted) Approx. 2,000 m2
G/F Approx. 5.75 m
1-8/F (4/F omitted) Approx. 4.62 m
7.5kPa
Approx. 9.3 m2 / TR for tenant area
General exhaust shaft to roof level at each unit
365 VA/sq m for G/F
294 VA/sq m for 1/F - 8/F (4/F omitted)
Various gas and purified water (Type II) supply
Centralized neutralization system for chemical disposal
Emergency exhaust, emergency shower and eye-washer provided at corridors
Typical Floor Plan
The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.
In case of any discrepancy between the English version, the traditional Chinese version and the simplified Chinese version, the English version shall prevail. The information contained herein is for reference only and does not constitute any representation, warranty or guarantee. All information contained herein (in particular, the completion dates for different batches and computer renderings) is subject to the approval of relevant government and regulatory authorities. All data stated herein are subject to final survey. Hong Kong-Shenzhen Innovation and Technology Park Limited reserves the absolute right to alter the specification, design and layout of the development as referred herein without prior notice.